NMHED Capital Funding Request Management System (CFRMS) 2021 - Submitted
- College of Engineering Thomas and Brown Replacement
- Nursing Expansion Health and Education Renovations
- Chemistry Building HVAC and Ventilation Upgrades
- Infrastructure Upgrades
- Rohavec Fine Arts Theatre Roof Replacement Repairs and Renovations
- Vocational Trades Center Building
- Chiller and Cooling Tower Replacement
- Sunland Park Roof Replacement
- Martinez Hall Improvements and SBDC Roof
Alamogordo
All Forms for Upload
Building Envelope Improvements - Townsend Library
- 01a-0-2023 NMSU Facilities 5 Year Plan-Combined-2022-hzw-20220521-FINAL-R5-SH-A
- 01a-1-Alamogordo-Campus Site Plan-sm
- 01a-2-292Q Alamogordo Townsend Library-Space Plan
- 01a-3-nmsua-strategic-plan- 20-2525 1.59.03 PM
- 01a-4-2021-7-2019 Stewardship D2 – FCI
- 01a-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01a-6-4155 Townsend-Budgetary-Estimate-Brief
- 01a-7-4155-Budgetary-Estimate-Brief-Campus-wide
- 01a-8-NMSU_A_Master Plan Draft us_v1-ARC
- 01a-9-NMSU-Master-Plan-9-27-17-RF
- 01a-2022_Project_Evaluation_Forms_REV_03.03.2021-A-Building Envelope Improve-R28
Alamogordo HVAC, Chiller & Boiler Repair/Replacement
- 01b-2022_Project_Evaluation_Forms_REV_03.03.2021-A-Chiller-Boiler Repairs-R27
- 01b-1-Alamogordo-Campus Site Plan
- 01b-2-292N Alamogordo professional tech-Space Plan
- 01b-3-nmsua-strategic-plan- 20-2525 1.59.03 PM
- 01b-4-2021-7-2019 Stewardship D2 – FCI
- 01b-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01b-6-4180 – Alamogordo HVAC Campus Assessment (Revised Final)
- 01b-7-NMSU Protech 4 Unit Repairs – Controls Replacement
- 01b-8-Alamo-protech HVAC Budgetary-Estimate-Brief
- 01b-9-NMSU-Master-Plan-9-27-17-RF
- 01b-10-NMSU_A_Master Plan Draft us_v1-ARC
Dona Ana Community College
All Forms for Upload
- Combined All – DACC
- 00-2021 Summer Hearing Checklist
- 01-2021 Submittal Certification
- 03-2021 Five Year Plan for Capital project Funding NMSU DACC
- 07-2021 Status of all Active projects NMSU DACC-R
- 08-2021 Status of all Closed Projects NMSU DACC-R
- 09-2021 IG Campus Wide Space Verification Spreadsheet NMSU DACC (not in this format)
DACC-Gadsden Center
- 01a-0-2023 NMSU Facilities 5 Year Plan-Combined-2022-hzw-20220521-FINAL-R4-SH-DA
- 01a-1-Gadsden Center-DACC-Site Plan
- 01a-2-567-DACC Gadsden Center-Space Plan
- 01a-3-DACC-2025-Strategic-Plan-Final-January-2021
- 01a-4-2021-7-2019 Stewardship D2 – FCI
- 01a-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01a-6-DACC_MP_2019-O-Excerpt-Gadsden Center
- 01a-7-DACC-Gadsden Roof Estimate Totals
- 01a-8-DACC-Gadsden Roof-Budgetary-Estimate-Brief 4-18-22
- 01a-9-DACC Enrollment Projection Table
- 01a-10-DACC_MP_2019-sm
- 01a-2022_Project_Evaluation_Forms_REV_03.03.2021- DACC Gadsden Roof-R1
DACC- East Mesa
- 01b-1-East Mesa-DACC-Site Plan
- 01b-2-606-DACC Digital Media-Space Plan
- 01b-3-DACC-2025-Strategic-Plan-Final-January-2021
- 01b-4-2021-7-2019 Stewardship D2 – FCI
- 01b-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01b-6-DACC_MP_2019-O-Excerpt-East Mesa
- 01b-7-4142-DACC DADM Roof Estimate Totals
- 01b-8-DACC DADM Roof-Budgetary-Estimate-Brief 4-18-22
- 01b-9-DACC Enrollment Projection Table
- 01b-10-DACC_MP_2019-sm
- 01b-11-05-16-2022 DACC Media Center NMSU Roof Inspection
- 01b-2022_Project_Evaluation_Forms_REV_03.03.2021- DACC Digital Media Roof-R14
Grants
All Forms for Upload
- Combined All – Grants
- 01-2021 Submittal Certification
- 03-2021 Five Year Plan for Capital Project Funding NMSU-G
- 05-2021 Status of all Active Projects NMSU-G
- 06-2021 Status of all Closed Projects NMSU-G-R
- 07-2021 IG Campus Wide Space Verification Spreadsheet NMSU-G (unable to upload)
Martinez Hall
- 01a-0-2023 NMSU Facilities 5 Year Plan-Combined-2022-hzw-20220521-FINAL-R5-SH-G
- 01a-1-Grants Campus-Site Map
- 01a-2-315Q-Grants Walter Martinez Building-Space Plan
- 01a-3-NMSU-Grants-SEEDS-Strategic-Plan-2020-2025
- 01a-4-2021-7-2019 Stewardship D2 – FCI
- 01a-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01a-6-8510.01 Final ME-NMSU Grants HVAC Campus Assessment-5-11-22
- 01a-7-NMSU 315Q Summary and CIPs
- 01a-8-Grants HVAC Estimate Section 1-Martinez Hall
- 01a-9-NMSU-Master-Plan-9-27-17-RF
- 01a-10-Grants HVAC Estimate Total-Martinez Hall-Combined
- 01a-2022_Project_Evaluation_Forms_REV_03.03.2021-G-Martinez Hall HVAC-R26
DACC- Grants
- 01b-1-Grants Campus-Site Map
- 01b-3-NMSU-Grants-SEEDS-Strategic-Plan-2020-2025
- 01b-4-2021-7-2019 Stewardship D2 – FCI
- 01b-5-NMSU ESPC II Preliminary Analysis – 04.03.2018
- 01b-8-4158 Grants- Campus Safety Security Budgetary-Estimate-Brief
- 01b-9-NMSU-Master-Plan-9-27-17-RF
- 01b-2022_Project_Evaluation_Forms_REV_03.03.2021-G-Infrastructure-Safety-R11
- 01b-Spring2022FCA02-sm-FCA Update
Las Cruces
All Forms for Upload
- 00-2021 Summer Hearing Checklist
- 01-2021 Submittal Certification
- 03-2021 Five Year Plan for Capital project Funding NMSU-LC
- 04-2021 IG Spreadsheet FTE Headcount 5-16-21 NMSU System
- 04-2021 IG Spreadsheet FTE(SCH) 5-16-21 NMSU System
- 07-2021 Status of all Active projects – NMSU-LC-PDE-R
- 08-2021 Status of all Closed Projects NMSU-LC-R
- 09-2021 IG Campus Wide Space Verification Spreadsheet NMSU-LC
Chemistry Building HVAC & Ventilation
- 01a-0-2023 NMSU Facilities 5 Year Plan-Combined-2022-hzw-20220521-FINAL-R4-SH-LC
- 01a-1-Chemistry Building-Campus Map
- 01a-2-187-Chemistry Building-Space Plan
- 01a-3-Copy of Annual Chemistry Building Use 2010-11 through 2019-20
- 01a-5-Chemistry CIP Report Summary
- 01a-5a-NMSU FCA Summary Findings-ARC-20210423
- 01a-6-Chemistry FCI Writing Summary
- 01a-07-Chemistry Building Mechanical System Maintenance Analysis 2022 0510
- 01a-8-Chemistry HVAC Upgrade 3-17-22
- 01a-9-HVAC Assessment 2020-Chemistry
- 01a-10-NMSU-Master-Plan-9-27-17-RF
- 01a-11-NMSU-LEADS-2025-revised-Draft-5_17_21
- 01a-13-New Mexico State University Technical Energy Audit – 01.31.2014
- 01a-14-2023 BRR Budget Presentation-sm-FINAL
- 01a-15-Chemistry HVAC Upgrade 3-17-22-Estimate
- 01a-15-FCI Building Assessmet Progress May 2022
- 01a-16-Chemistry Building Mechanical System Energy Analysis 2022 0519 (002)
- 01a-2022_Project_Evaluation_Forms_REV_03.03.2021-20220409-Chemistry Building HVAC-R11
Cole Village Demolition
- 01b-1-Cole Village-Campus Map
- 01b-2-270-Cole village-Space Plan
- 01b-3-Cole Village Demolition
- 01b-5-NMSU Police Support for Cole Village Demolition
- 01b-6-NMSU-Fire-2022_4_21 Letter to HED-Demo of Cole Village
- 01b-7-Cole Village Demolition Maintenance Analysis 2022 0518 Rev A
- 01b-10-NMSU-Master-Plan-9-27-17-RF
- 01b-11-NMSU-LEADS-2025-revised-Draft-5_17_21
- 01b-12-Cole Village Demolition Estimate Details
- 01b-13-New Mexico State University Technical Energy Audit – 01.31.2014
- 01b-14-2023 BRR Budget Presentation-sm-FINAL
- 01b-15-Cole Village Energy Analysis 2022 0519 Rev A (002)
- 01b-16-Capital hearing 2021 7.22.2021-LC-R10-hzw-sm-Excerpt-DM
- 01b-2022_Project_Evaluation_Forms_REV_03.03.2021-20220409-Selective Demo-Cole Village-R26
Ag Science Center Improvements
- 01c-1-ASC Combined-Site Plans-Priorities
- 01c-2-ASC Statewide-Priorities-Space Plans
- 01c-3-2020-aes_advisory_report_final
- 01c-6-Priority Ag Science Center CIP and FCI (error uploading)
- 01c-8-FY22 Capital Outlay-Ag Center Estimate BriefREV5-26-22
- 01c-10-NMSU-Master-Plan-9-27-17-RF
- 01c-11-NMSU-LEADS-2025-revised-Draft-5_17_21
- 01c-13-New Mexico State University Technical Energy Audit – 01.31.2014
- 01c-14-2023 BRR Budget Presentation-sm-FINAL
- 01c-15-NMSU Ag Science Center Facilities Master Plan-DRAFT-20220527-R (error uploading)
- 01c-16-Capital hearing 2021 7.22.2021-LC-R10-hzw-sm-Excerpt-DM
- 01c-17-Ag Science Center Housing Estimate
- 01c-2022_Project_Evaluation_Forms_REV_03.03.2021-20220409-ASC Statewide-R49
Infrastructure Upgrades
- 01d-1-UTILITIES MAP-STEAM-Campus
- 01d-9-NMSU FCA Summary Findings-ARC-20210423-Excerpt
- 01d-10-NMSU-Master-Plan-9-27-17-RF
- 01d-11-NMSU-LEADS-2025-revised-Draft-5_17_21
- 01d-12-Steam Infrastructure Maintenance Analysis 2022 0506 Rev A
- 01d-13-New Mexico State University Technical Energy Audit – 01.31.2014
- 01d-14-2023 BRR Budget Presentation-sm-FINAL
- 01d-15-Steam Infrastructure Energy Analysis Natural Gas (002)
- 01d-16-NMSU Fire Department April 22 2022 Steam Leaks
- 01d-17-22017.00 NMSU Steam and Condensate Piping UDP Update
- 01d-18-Capital hearing 2021 7.22.2021-LC-R10-hzw-sm-Excerpt-DM
- 01d-201_Steam System Narrative-GLHN-20090616
- 01d-2022_Project_Evaluation_Forms_REV_03.03.2021-20220409-Infrastructure Upgrades-R24